Phased, validatedand yours to run.

Our Professional Services team implements POMS MES with your production, quality and IT teams, then hands over the knowledge to carry on.

Shoulder to shoulder.

On site with your team when the work needs it, remote the rest of the time.

15+years

Average experience of our services team implementing POMSnet in life sciences.

200+

Validated sites run POMS MES.

Seven phases,one way of working.

Every POMS project follows the same methodology, based on the GAMP 5 V-model, with standard processes and deliverables in each phase.

  1. 01

    Concept

    Goals, scope and a budget estimate.

  2. 02

    Planning

    Project plan, quality plan and schedule.

  3. 03

    Analysis

    Requirements, fit analysis and an EBR prototype.

  4. 04

    Design

    Functional, interface and infrastructure design.

  5. 05

    Implementation

    Configuration and risk-based factory acceptance testing.

  6. 06

    Customer installation

    Validation system setup, IQ and OQ.

  7. 07

    Commissioning

    Data migration, go-live and PQ support.

Your project team

Working with your project manager and subject matter experts.

  • Program manager

    Owns the overall success of the project, including quality.

  • Project manager

    Runs resources, schedule and budget with your project manager.

  • Technical lead

    Defines the solution and leads the configuration.

  • Quality lead

    Keeps every document in line with the quality plan and regulations.

  • Automation integration specialist

    Connects POMSnet Aquila to your process control systems.

  • Interface specialist

    Connects POMSnet Aquila to your enterprise systems.

Roll outat your own pace.

Most customers do not do everything at once. We weigh the options with you and present them to your stakeholders.

Horizontal

One capability across the site, such as material management or weigh and dispense.

Vertical

Full electronic batch records, end to end, for one product family or line.

Global program

One template, rolled out site by site, often by your own team.

3 months

to a validated material management and traceability MES.

Pharmaceutical customer, VP Finance and Project Management

How Orion phased it.

  1. 2022

    Weighing and dispensing at every manufacturing site.

  2. Oct 2023

    A full MES pilot, live in one department.

  3. By 2028

    Full MES in every manufacturing and packaging department.

Validation inevery phase.

A quality lead keeps every deliverable in line with your quality plan and the regulations.

Standards we work to

  • GAMP 5
  • cGMP
  • 21 CFR Part 11
  • EU Annex 11
  • ISA-88
  • ISA-95
More on validation
  • 01

    Traceability

    A traceability matrix ties each requirement to its design and its test.

  • 02

    Risk-based testing

    Factory acceptance testing, focused by risk, before installation at your site.

  • 03

    IQ, OQ and PQ

    Validation system setup, IQ and OQ at your site, then PQ support at go-live.

  • 04

    Upgrades

    With the Product Validation Kit, you validate the change, not the whole system.

Learn by doing.Then take over.

Knowledge transfer is hands-on. Your team configures alongside ours from the start.

Configured, not coded
POMSnet Aquila is designed for operations and quality teams to carry on.
Your next phase
After an initial project, many customers roll out new products and sites themselves.
More on training

Still hereafter go-live.

24/7

MES engineers on call, 24 hours a day, 7 days a week.

Get support

Thin on MES resources?

Our recipe authors, validation and test engineers can join your team, with the latest product know-how.

  • Recipe authoring
  • Validation
  • Testing
Talk to us

Questions buyers ask

We have limited IT resources. Can we still run POMS MES?

Yes. POMSnet Aquila is configured, not coded, and designed for operations teams to carry on. After an initial project, many customers deploy further phases with their own people.

We are a cell and gene therapy start-up. Where should we start?

We look at the resources you have, the timing of your clinical trials and your business model, then give you options for where to start.

Can POMS help build the business case?

Yes. Our consultants can run an ROI study and gather your requirements, so you get the most value from your MES investment.

Does POMS work on site?

Yes. Our engineers work on site alongside your team when the work needs it, and remotely the rest of the time. Local and global teams work in sync.

Plan your MESproject with us.

Tell us where you want to start. We will show you how the project would run.