MES validation,phase by phase.
Every POMS project follows the GAMP 5 V-model, with the documents and testing your validation team needs in each phase.
Conceptual viewTraceability matrix
REQ-012Dispensed weight stays within limits
- Functional specFS-4.3Approved
- IQ testIQ-007Pass
- OQ testOQ-014Pass
- PQ testPQ-003Pass
Standards we work to
- GAMP 5
- Risk-based validation
- cGMP
- Good manufacturing practice
- 21 CFR Part 11
- Electronic records and signatures
- EU Annex 11
- Computerised systems
- ISA-88
- Recipes
- ISA-95
- Plant and enterprise systems
Our services team averages 15+ years implementing POMSnet in life sciences.
Every specificationhas its test.
GAMP 5 pairs each specification with the test that verifies it. Choose one to see how it is proven.
Specify, on the way down
Verify, on the way up
01 / 04
User requirementsPerformance qualification
What the MES must do at your site, tested in performance qualification.
- Specified in
- Functional requirements and fit analysis
- 03 Analysis
- Proven by
- PQ support at go-live
- 07 Commissioning
The traceability matrix ties each requirement to its design and its test.
How a project runsWhat you getin each phase.
Standard deliverables in every phase. A quality lead on every project keeps them in line with your quality plan and the regulations.
- 01
Concept
- Proposal
- Budget estimate
- 02
Planning
- Project plan
- Quality plan
- Detailed project schedule
- 03
Analysis
- Functional requirements and fit analysis
- Traceability matrix
- Blueprint
- EBR prototype
- 04
Design
- Functional design specification
- Interface design specification
- Infrastructure design specification
- Data plan
- Updated traceability matrix
- 05
Implementation
IQOQ- System configuration
- Installation verification manual
- Risk-based factory acceptance testing
IQOQ - 06
Customer installation
IQOQ- Validation system setup
- IQ and OQ at your site
IQOQ - 07
Commissioning
PQ- Production system setup
- Data migration
- Go-live
- PQ support
PQ
IQ, OQ and PQ: installation, operational and performance qualification.
Test wherethe risk is.
Walk through each instruction with an operator and a quality reviewer: what could go wrong, and which control catches it?

01High risk
Test thoroughly.
Limits, identity checks, signatures and calculations that affect product quality.
02Medium risk
Test the main paths.
Workflow and status logic that supports GMP decisions.
03Low risk
Rely on supplier testing.
Display and convenience features.
Where an MESsits in GAMP 5.
A configurable MES such as POMSnet Aquila is usually treated as category 4. Your own assessment decides.
01
Start with intended use.
What the MES will do at your site, and which decisions depend on its records.
02
Use what the supplier provides.
A configured product is tested by its supplier before release. Your validation can rely on that testing and focus on your configuration.
Keep itvalidated.
After go-live, change control, periodic review and risk-based testing of upgrades keep the system in a validated state.
01
Change control
Assess each change, then test what it affects.
02
Periodic review
A POMS health check reviews your installation, configuration and performance.
03
Upgrades
With the Product Validation Kit, you validate the change, not the whole system.
04
On your schedule
POMS never forces an upgrade, so you plan each one with your validation team.
Thin on validation resources?
Our validation and test engineers can join your team, with the latest product know-how.
Talk to us- Validation
- Documents and testing for new products, sites and releases.
- Testing
- Test scripts and execution for configuration changes and upgrades.
Questions validation teams ask
What GAMP 5 category is an MES?
A configurable MES such as POMSnet Aquila is usually treated as GAMP category 4, configured software. Any custom-coded parts would be category 5. Your validation approach should follow your own assessment.
Does POMS validate the system for us?
Validation is the manufacturer's responsibility. POMS provides documentation, testing and validation services, and its project methodology follows the GAMP 5 V-model.
Do we have to revalidate everything at each upgrade?
No. A risk-based approach focuses testing on what changed and what it affects. Release notes help you assess each change.
What does the Product Validation Kit cover?
It provides operational qualification (OQ) of the core standard product, so your own testing can focus on your configuration, your intended use and what changed.

Plan yourvalidation.
Talk to POMS about the documentation and testing you need.